NOI Solar · How it works

From one bill to switched on.

47 days on average from signed contract to a working system, the same named people throughout, and nothing to sign until you have seen your numbers in writing.

Crew installing solar panels on a roof
01 / The process

What happens, and when.

You can stop at any step before you sign, at no cost.

Designer reviewing a solar layout
Step 1 · Free

Review and design

Send one bill. Within 2 business days you get a written review. Then a 15-minute call and a remote or on-site visit, and an Aurora design with every brand named. About 7 to 10 days.

Equipment staged in a warehouse
Step 2 · 20 to 30 days

Permits and utility

We file the town permit and the utility interconnection application, and stage your equipment at our Bristol, CT warehouse.

Crew installing panels on a roof
Step 3 · One day

Install

Local crew, local trucks. Most systems are installed in one day, with the final inspection scheduled before we leave.

Technician checking a solar system
Step 4 · 5 to 15 days

Switch on and service

The utility gives permission to operate, we file the incentive paperwork, and our local crews service the system for its whole life.

Free solar review

See your numbers before you commit to anything.

Send us one electric bill. You get a written review of your home: what solar and a battery would cost, what they would save, and which incentives apply. Free, and free when the answer is no.